Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 7 · Finish and Seal Treads

Once the adhesive is fully cured, lightly sand the surface of the treads to remove any imperfections and prepare them for finishing. Use a fine-grit sandpaper. Wipe away all dust with a tack cloth. Apply your chosen finish, such as polyurethane, varnish, or paint, in thin, even coats. Follow the manufacturer's instructions for application and drying times between coats. Apply at least two coats for durability.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Finish and Seal Treads

Once the adhesive is fully cured, lightly sand the surface of the treads to remove any imperfections and prepare them for finishing. Use a fine-grit sandpaper. Wipe away all dust with a tack cloth. Apply your chosen finish, such as polyurethane, varnish, or paint, in thin, even coats. Follow the manufacturer's instructions for application and drying times between coats. Apply at least two coats for durability.

Videos for this step

Seal Stained TreadsApply Polyurethane Finish to TreadsApply Polyurethane Sealer

← Project

Stair Tread Installation

Step 7 of 7·3 hr left

Prepare Riser Structure
90 minutes
Measure and Cut Treads
60 minutes
Dry Fit Treads
30 minutes
Apply Adhesive
45 minutes
Install Treads
75 minutes
Allow Adhesive to Cure
1440 minutes
7
Finish and Seal Treads
180 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.