Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 1 · Prepare Riser Structure

Inspect the existing riser structure for any loose components, rot, or damage. Secure any loose boards with appropriate screws. If there is any sign of rot, remove the damaged section and replace it with a sound piece of wood. Ensure the framing is sturdy and can support the weight of the new treads. Clean away any dust, debris, or old adhesive from the riser surfaces.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Prepare Riser Structure

Inspect the existing riser structure for any loose components, rot, or damage. Secure any loose boards with appropriate screws. If there is any sign of rot, remove the damaged section and replace it with a sound piece of wood. Ensure the framing is sturdy and can support the weight of the new treads. Clean away any dust, debris, or old adhesive from the riser surfaces.

Videos for this step

Tighten Loose RisersAssess Stair Structure and Plan Riser InstallationInstall Risers

← Project

Stair Tread Installation

Step 1 of 7·32 hr left

1
Prepare Riser Structure
90 minutes
2
Measure and Cut Treads
60 minutes
3
Dry Fit Treads
30 minutes
4
Apply Adhesive
45 minutes
5
Install Treads
75 minutes
6
Allow Adhesive to Cure
1440 minutes
7
Finish and Seal Treads
180 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.