Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 6 · Allow Adhesive to Cure

Keep foot traffic off the stairs for the duration recommended by the construction adhesive manufacturer. This typically ranges from 24 to 72 hours. Ensure the area is undisturbed to allow the adhesive to form a strong, permanent bond.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Allow Adhesive to Cure

Keep foot traffic off the stairs for the duration recommended by the construction adhesive manufacturer. This typically ranges from 24 to 72 hours. Ensure the area is undisturbed to allow the adhesive to form a strong, permanent bond.

Videos for this step

Allow for Curing and Final CleanupAllow Glue to Cure and Plan ReinforcementApply Weights for Adhesive Bonding

← Project

Stair Tread Installation

Step 6 of 7·27 hr left

Prepare Riser Structure
90 minutes
Measure and Cut Treads
60 minutes
Dry Fit Treads
30 minutes
Apply Adhesive
45 minutes
Install Treads
75 minutes
6
Allow Adhesive to Cure
1440 minutes
7
Finish and Seal Treads
180 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.