Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 5 · Install Treads

Position each tread onto its prepared riser, pressing down firmly to ensure good contact with the adhesive. For added security, drive screws up from underneath the riser structure into the underside of the tread, or from the top of the tread into the riser framing if accessible and desired for a hidden finish. Use at least two screws per tread, spaced appropriately. Ensure the tread is level and flush before the adhesive begins to set.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Install Treads

Position each tread onto its prepared riser, pressing down firmly to ensure good contact with the adhesive. For added security, drive screws up from underneath the riser structure into the underside of the tread, or from the top of the tread into the riser framing if accessible and desired for a hidden finish. Use at least two screws per tread, spaced appropriately. Ensure the tread is level and flush before the adhesive begins to set.

Videos for this step

Install New TreadsInstall First TreadInstall Treads and Risers

← Project

Stair Tread Installation

Step 5 of 7·28.3 hr left

Prepare Riser Structure
90 minutes
Measure and Cut Treads
60 minutes
Dry Fit Treads
30 minutes
Apply Adhesive
45 minutes
5
Install Treads
75 minutes
6
Allow Adhesive to Cure
1440 minutes
7
Finish and Seal Treads
180 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.