Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 3 · Dry Fit Treads

Place each cut tread onto its designated riser without any adhesive or fasteners. Check for a snug fit and ensure there are no significant gaps or high spots. Make any necessary minor adjustments by trimming edges with a hand plane or sandpaper. This step is crucial to ensure the final installation is level and secure.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Dry Fit Treads

Place each cut tread onto its designated riser without any adhesive or fasteners. Check for a snug fit and ensure there are no significant gaps or high spots. Make any necessary minor adjustments by trimming edges with a hand plane or sandpaper. This step is crucial to ensure the final installation is level and secure.

Videos for this step

Dry Fit Tread and NosingInstall New Treads and Secure with Shims/Glue/NailsInstall Retro Treads

← Project

Stair Tread Installation

Step 3 of 7·29.5 hr left

Prepare Riser Structure
90 minutes
Measure and Cut Treads
60 minutes
3
Dry Fit Treads
30 minutes
4
Apply Adhesive
45 minutes
5
Install Treads
75 minutes
6
Allow Adhesive to Cure
1440 minutes
7
Finish and Seal Treads
180 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.