Step 9 · Apply Finish

Apply your chosen finish to the oak treads. This could be a clear polyurethane, varnish, or stain followed by a topcoat. Follow the manufacturer's instructions for application and drying times. Typically, multiple thin coats are better than one thick coat. Ensure you apply the finish evenly and allow adequate drying time between coats. Lightly sand with very fine-grit sandpaper (320-grit or higher) between coats for a smoother result, wiping with a tack cloth after each sanding.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 9 · Apply Finish

Apply your chosen finish to the oak treads. This could be a clear polyurethane, varnish, or stain followed by a topcoat. Follow the manufacturer's instructions for application and drying times. Typically, multiple thin coats are better than one thick coat. Ensure you apply the finish evenly and allow adequate drying time between coats. Lightly sand with very fine-grit sandpaper (320-grit or higher) between coats for a smoother result, wiping with a tack cloth after each sanding.

← Project

Oak Stair Tread Installation

Step 9 of 9·2 hr left

Remove Old Treads
30 minutes
Prepare the Stringers and Risers
60 minutes
Measure and Cut New Treads
90 minutes
Test Fit the New Treads
30 minutes
Apply Adhesive
20 minutes
Secure the New Treads
45 minutes
Fill Screw/Nail Holes
25 minutes
Sand and Smooth
75 minutes
9
Apply Finish
120 minutes