Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings
Project video

Step 6 · Secure the New Treads

Place the adhesive-coated treads back onto the stair structure. Press down firmly to ensure good contact with the adhesive. Secure each tread by driving screws or nails through the tread into the stringers and possibly the riser. Pre-drilling pilot holes can prevent the wood from splitting, especially near the ends of the treads. If using screws, countersink them slightly below the surface so they can be concealed later. Ensure fasteners are long enough to securely engage the underlying structure.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Secure the New Treads

Place the adhesive-coated treads back onto the stair structure. Press down firmly to ensure good contact with the adhesive. Secure each tread by driving screws or nails through the tread into the stringers and possibly the riser. Pre-drilling pilot holes can prevent the wood from splitting, especially near the ends of the treads. If using screws, countersink them slightly below the surface so they can be concealed later. Ensure fasteners are long enough to securely engage the underlying structure.

← Project

Oak Stair Tread Installation

Step 6 of 9·4.4 hr left

Remove Old Treads
30 minutes
Prepare the Stringers and Risers
60 minutes
Measure and Cut New Treads
90 minutes
Test Fit the New Treads
30 minutes
Apply Adhesive
20 minutes
6
Secure the New Treads
45 minutes
7
Fill Screw/Nail Holes
25 minutes
8
Sand and Smooth
75 minutes
9
Apply Finish
120 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.