Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings
Project video

Step 3 · Measure and Cut New Treads

Measure the width, depth (from riser to nosing), and thickness of each stair opening. Pay close attention to the nosing, which is the rounded edge that overhangs the riser. Transfer these measurements to your new oak tread material. Use a measuring tape and a pencil for accuracy. Carefully cut the treads using a circular saw or a miter saw. For precise fits, especially around volutes or curved stringers, a jigsaw might be necessary. Ensure cuts are straight and square where needed.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Measure and Cut New Treads

Measure the width, depth (from riser to nosing), and thickness of each stair opening. Pay close attention to the nosing, which is the rounded edge that overhangs the riser. Transfer these measurements to your new oak tread material. Use a measuring tape and a pencil for accuracy. Carefully cut the treads using a circular saw or a miter saw. For precise fits, especially around volutes or curved stringers, a jigsaw might be necessary. Ensure cuts are straight and square where needed.

← Project

Oak Stair Tread Installation

Step 3 of 9·6.8 hr left

Remove Old Treads
30 minutes
Prepare the Stringers and Risers
60 minutes
3
Measure and Cut New Treads
90 minutes
4
Test Fit the New Treads
30 minutes
5
Apply Adhesive
20 minutes
6
Secure the New Treads
45 minutes
7
Fill Screw/Nail Holes
25 minutes
8
Sand and Smooth
75 minutes
9
Apply Finish
120 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.