Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 9 · Install Faucet and Final Touches

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

With the plumbing confirmed to be leak-free, you can now complete the installation. Install the new tub spout and faucet handles onto the valve body in the wall. Once all plumbing fixtures are installed, you can proceed with closing the wall. This typically involves installing cement backer board, followed by your chosen tile or a solid surface surround. After the walls are finished, the final plumbing step is to apply a thick bead of 100% silicone caulk in the gap where the tub deck meets the finished wall. Smooth the bead with a wet finger or caulk tool for a clean, waterproof seal.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 9 · Install Faucet and Final Touches

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

With the plumbing confirmed to be leak-free, you can now complete the installation. Install the new tub spout and faucet handles onto the valve body in the wall. Once all plumbing fixtures are installed, you can proceed with closing the wall. This typically involves installing cement backer board, followed by your chosen tile or a solid surface surround. After the walls are finished, the final plumbing step is to apply a thick bead of 100% silicone caulk in the gap where the tub deck meets the finished wall. Smooth the bead with a wet finger or caulk tool for a clean, waterproof seal.

Videos for this step

Reassemble Trim and Apply SealantSet and Seal the BathtubSecuring the Tub

Tools and Materials

← Project

How to Install a New Bathtub and Drain Assembly

Step 9 of 9·almost done

Preparation and Old Tub Removal
3 mins7 items
Subfloor and Stud Inspection
2 mins8 itemsAdvanced
Pre-assemble the Drain and Overflow
1 min4 itemsAdvanced
Install Stringer Board
30 mins9 itemsIntermediate
Set the Bathtub in Place
1 min6 items
Secure Tub to Studs
30 mins2 itemsIntermediate
Connect Drain to Waste Line
1 min6 itemsAdvanced
Leak Test
30 mins4 itemsIntermediate
9
Install Faucet and Final Touches
2 mins7 itemsAdvanced
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.