Step 7 · Connect Drain to Waste Line

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Now you will make the final plumbing connection. Working from your access point, dry-fit the tailpiece from the new tub's overflow tee to the existing P-trap. You will likely need to cut a piece of PVC or ABS pipe to the correct length to join them. Use a pipe cutter or hacksaw for a clean cut. Once you are certain of the fit, apply PVC/ABS primer to the outside of the pipes and the inside of the fittings, followed immediately by the cement. Push the pieces together with a slight twist and hold for 30 seconds to allow the solvent weld to set. Ensure the P-trap is properly aligned to hold water.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Connect Drain to Waste Line

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Now you will make the final plumbing connection. Working from your access point, dry-fit the tailpiece from the new tub's overflow tee to the existing P-trap. You will likely need to cut a piece of PVC or ABS pipe to the correct length to join them. Use a pipe cutter or hacksaw for a clean cut. Once you are certain of the fit, apply PVC/ABS primer to the outside of the pipes and the inside of the fittings, followed immediately by the cement. Push the pieces together with a slight twist and hold for 30 seconds to allow the solvent weld to set. Ensure the P-trap is properly aligned to hold water.

Videos for this step

Assemble and Install DrainpipeInstall P-TrapInstall P-Trap and Connect to Wall

Tools and Materials

← Project

How to Install a New Bathtub and Drain Assembly

Step 7 of 9·33 min left

Preparation and Old Tub Removal
3 mins7 items
Subfloor and Stud Inspection
2 mins8 itemsAdvanced
Pre-assemble the Drain and Overflow
1 min4 itemsAdvanced
Install Stringer Board
30 mins9 itemsIntermediate
Set the Bathtub in Place
1 min6 items
Secure Tub to Studs
30 mins2 itemsIntermediate
7
Connect Drain to Waste Line
1 min6 itemsAdvanced
8
Leak Test
30 mins4 itemsIntermediate
9
Install Faucet and Final Touches
2 mins7 itemsAdvanced
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.