Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 6 · Secure Tub to Studs

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Once the tub is perfectly level and set (allow mortar to cure if used), you must secure it to the wall framing. Most tubs have an integrated flange with pre-drilled holes that rests against the studs. Using a drill, drive 1-1/2 inch galvanized roofing nails or stainless steel screws through these holes into the studs. If there are no pre-drilled holes, drill them yourself about every 8-12 inches along the flange. Do not overtighten the fasteners, as this can crack the acrylic or fiberglass flange.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Secure Tub to Studs

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Once the tub is perfectly level and set (allow mortar to cure if used), you must secure it to the wall framing. Most tubs have an integrated flange with pre-drilled holes that rests against the studs. Using a drill, drive 1-1/2 inch galvanized roofing nails or stainless steel screws through these holes into the studs. If there are no pre-drilled holes, drill them yourself about every 8-12 inches along the flange. Do not overtighten the fasteners, as this can crack the acrylic or fiberglass flange.

Videos for this step

Set the BathtubRemove Flange FastenersRemove Tub from Alcove

Tools and Materials

← Project

How to Install a New Bathtub and Drain Assembly

Step 6 of 9·1.1 hr left

Preparation and Old Tub Removal
3 mins7 items
Subfloor and Stud Inspection
2 mins8 itemsAdvanced
Pre-assemble the Drain and Overflow
1 min4 itemsAdvanced
Install Stringer Board
30 mins9 itemsIntermediate
Set the Bathtub in Place
1 min6 items
6
Secure Tub to Studs
30 mins2 itemsIntermediate
7
Connect Drain to Waste Line
1 min6 itemsAdvanced
8
Leak Test
30 mins4 itemsIntermediate
9
Install Faucet and Final Touches
2 mins7 itemsAdvanced
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.