Step 5 · Set the Bathtub in Place

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Many fiberglass and acrylic tubs require a mortar bed for support to prevent flexing and cracking. Check your tub's instructions. If required, mix a bag of mortar mix with water in a bucket to a thick, pancake-batter consistency. Trowel a 1-2 inch thick layer of the mortar onto the subfloor where the base of the tub will sit. With a helper, carefully lift the new tub, angling it to get the pre-assembled drain through the hole in the floor. Slide it into the alcove, resting the back flange on the stringer board. Gently press the tub down into the mortar bed. Use your level across the tub deck in both directions (lengthwise and widthwise) to ensure it is perfectly level. Use wood shims under the feet if necessary to achieve level before the mortar sets.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Set the Bathtub in Place

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Many fiberglass and acrylic tubs require a mortar bed for support to prevent flexing and cracking. Check your tub's instructions. If required, mix a bag of mortar mix with water in a bucket to a thick, pancake-batter consistency. Trowel a 1-2 inch thick layer of the mortar onto the subfloor where the base of the tub will sit. With a helper, carefully lift the new tub, angling it to get the pre-assembled drain through the hole in the floor. Slide it into the alcove, resting the back flange on the stringer board. Gently press the tub down into the mortar bed. Use your level across the tub deck in both directions (lengthwise and widthwise) to ensure it is perfectly level. Use wood shims under the feet if necessary to achieve level before the mortar sets.

Videos for this step

Adjust Leveling FeetPrepare Installation AreaSet and Seal the Bathtub

Tools and Materials

← Project

How to Install a New Bathtub and Drain Assembly

Step 5 of 9·1.1 hr left

Preparation and Old Tub Removal
3 mins7 items
Subfloor and Stud Inspection
2 mins8 itemsAdvanced
Pre-assemble the Drain and Overflow
1 min4 itemsAdvanced
Install Stringer Board
30 mins9 itemsIntermediate
5
Set the Bathtub in Place
1 min6 items
6
Secure Tub to Studs
30 mins2 itemsIntermediate
7
Connect Drain to Waste Line
1 min6 itemsAdvanced
8
Leak Test
30 mins4 itemsIntermediate
9
Install Faucet and Final Touches
2 mins7 itemsAdvanced