Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 4 · Install Stringer Board

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

To provide solid, level support, most alcove tubs require a stringer board (or ledger board). Refer to your tub's installation manual to find the required height from the subfloor to the underside of the tub's flange. Mark this height on the studs at both ends of the back wall. Use a 4-foot level to draw a perfectly level line connecting these marks across all the studs. Cut a 2x4 to the length of the back wall and secure it to the studs with screws, aligning the top edge of the board with your level line. This will support the weight of the tub's rim.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Install Stringer Board

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

To provide solid, level support, most alcove tubs require a stringer board (or ledger board). Refer to your tub's installation manual to find the required height from the subfloor to the underside of the tub's flange. Mark this height on the studs at both ends of the back wall. Use a 4-foot level to draw a perfectly level line connecting these marks across all the studs. Cut a 2x4 to the length of the back wall and secure it to the studs with screws, aligning the top edge of the board with your level line. This will support the weight of the tub's rim.

Videos for this step

Set and Secure the New TubSecure and Level the BathtubRemove Tub from Alcove

Tools and Materials

← Project

How to Install a New Bathtub and Drain Assembly

Step 4 of 9·1.6 hr left

Preparation and Old Tub Removal
3 mins7 items
Subfloor and Stud Inspection
2 mins8 itemsAdvanced
Pre-assemble the Drain and Overflow
1 min4 itemsAdvanced
4
Install Stringer Board
30 mins9 itemsIntermediate
5
Set the Bathtub in Place
1 min6 items
6
Secure Tub to Studs
30 mins2 itemsIntermediate
7
Connect Drain to Waste Line
1 min6 itemsAdvanced
8
Leak Test
30 mins4 itemsIntermediate
9
Install Faucet and Final Touches
2 mins7 itemsAdvanced
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.