Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 7 · Continue Laying Rows

Continue installing rows, staggering the end joints of the planks or tiles to create a random pattern. The recommended stagger is usually at least 6 inches. Use a tapping block and mallet (for click-lock or tongue-and-groove systems) to ensure tight connections between planks. For glued-down systems, continue applying adhesive and placing flooring as per the manufacturer's instructions. Cut the last plank in each row to fit, remembering to account for the expansion gap.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Continue Laying Rows

Continue installing rows, staggering the end joints of the planks or tiles to create a random pattern. The recommended stagger is usually at least 6 inches. Use a tapping block and mallet (for click-lock or tongue-and-groove systems) to ensure tight connections between planks. For glued-down systems, continue applying adhesive and placing flooring as per the manufacturer's instructions. Cut the last plank in each row to fit, remembering to account for the expansion gap.

Videos for this step

Continue Laying and Cutting PlanksLay Subsequent Rows from Installed SurfaceLay Remaining Rows and Stagger Seams

Tools and Materials

← Project

Flooring & Tiling

Step 7 of 11·12 hr left

Assess Existing Floor
60 minutes6 items
Remove Existing Flooring and Trim
180 minutes7 items
Prepare the Subfloor
240 minutes8 items
Acclimate Flooring Materials
10 minutes2 items
Lay Out Flooring
45 minutes2 items
Install First Row of Flooring
90 minutes7 items
7
Continue Laying Rows
360 minutes8 items
8
Cut Around Obstacles
120 minutes6 items
9
Install Final Row
60 minutes5 items
10
Install Transition Strips and Trim
120 minutes9 items
11
Clean Up and Final Inspection
60 minutes5 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.