Step 3 · Prepare the Subfloor

Sweep and vacuum the subfloor thoroughly to remove all dust, debris, and loose particles. Fill any low spots with a floor leveling compound, following the manufacturer's instructions for mixing and application. Sand down any high spots or uneven areas using a floor sander or hand sanding. Ensure all nails or screws are flush with the subfloor surface or removed. For wood subfloors, check for any loose or squeaky boards and secure them with screws.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Prepare the Subfloor

Sweep and vacuum the subfloor thoroughly to remove all dust, debris, and loose particles. Fill any low spots with a floor leveling compound, following the manufacturer's instructions for mixing and application. Sand down any high spots or uneven areas using a floor sander or hand sanding. Ensure all nails or screws are flush with the subfloor surface or removed. For wood subfloors, check for any loose or squeaky boards and secure them with screws.

Videos for this step

Prepare SubfloorPrepare the SubfloorPrepare and Clean the Subfloor

Tools and Materials

← Project

Flooring & Tiling

Step 3 of 11·18.4 hr left

Assess Existing Floor
60 minutes6 items
Remove Existing Flooring and Trim
180 minutes7 items
3
Prepare the Subfloor
240 minutes8 items
4
Acclimate Flooring Materials
10 minutes2 items
5
Lay Out Flooring
45 minutes2 items
6
Install First Row of Flooring
90 minutes7 items
7
Continue Laying Rows
360 minutes8 items
8
Cut Around Obstacles
120 minutes6 items
9
Install Final Row
60 minutes5 items
10
Install Transition Strips and Trim
120 minutes9 items
11
Clean Up and Final Inspection
60 minutes5 items