Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 10 · Install Transition Strips and Trim

Install transition strips (e.g., reducers, t-molding) where the new flooring meets different flooring types or at exterior doorways. Secure them according to manufacturer instructions, often involving screws or adhesive. Reinstall baseboards or apply new trim around the perimeter of the room. Ensure the trim covers the expansion gap. Nail or adhesive the trim in place, being careful not to puncture the new flooring.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 10 · Install Transition Strips and Trim

Install transition strips (e.g., reducers, t-molding) where the new flooring meets different flooring types or at exterior doorways. Secure them according to manufacturer instructions, often involving screws or adhesive. Reinstall baseboards or apply new trim around the perimeter of the room. Ensure the trim covers the expansion gap. Nail or adhesive the trim in place, being careful not to puncture the new flooring.

Videos for this step

Install Baseboards and TrimReinstall Baseboards and Final TransitionsInstall Transition Strips and Finish Flooring

Tools and Materials

← Project

Flooring & Tiling

Step 10 of 11·3 hr left

Assess Existing Floor
60 minutes6 items
Remove Existing Flooring and Trim
180 minutes7 items
Prepare the Subfloor
240 minutes8 items
Acclimate Flooring Materials
10 minutes2 items
Lay Out Flooring
45 minutes2 items
Install First Row of Flooring
90 minutes7 items
Continue Laying Rows
360 minutes8 items
Cut Around Obstacles
120 minutes6 items
Install Final Row
60 minutes5 items
10
Install Transition Strips and Trim
120 minutes9 items
11
Clean Up and Final Inspection
60 minutes5 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.