Step 6 · Install First Row of Flooring

Place the first plank or tile against the starting wall. Use spacers between the flooring and the wall to maintain a consistent expansion gap, as recommended by the manufacturer (typically 1/4 to 1/2 inch). If using a click-lock system, connect the second piece to the first, ensuring a tight seam. For glued-down flooring, apply adhesive according to the manufacturer's instructions before placing the planks.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Install First Row of Flooring

Place the first plank or tile against the starting wall. Use spacers between the flooring and the wall to maintain a consistent expansion gap, as recommended by the manufacturer (typically 1/4 to 1/2 inch). If using a click-lock system, connect the second piece to the first, ensuring a tight seam. For glued-down flooring, apply adhesive according to the manufacturer's instructions before placing the planks.

Videos for this step

Lay the First Row of PlanksLay the First Row of PlanksInstall First Row of Planks

Tools and Materials

← Project

Flooring & Tiling

Step 6 of 11·13.5 hr left

Assess Existing Floor
60 minutes6 items
Remove Existing Flooring and Trim
180 minutes7 items
Prepare the Subfloor
240 minutes8 items
Acclimate Flooring Materials
10 minutes2 items
Lay Out Flooring
45 minutes2 items
6
Install First Row of Flooring
90 minutes7 items
7
Continue Laying Rows
360 minutes8 items
8
Cut Around Obstacles
120 minutes6 items
9
Install Final Row
60 minutes5 items
10
Install Transition Strips and Trim
120 minutes9 items
11
Clean Up and Final Inspection
60 minutes5 items