Step 1 · Assess Existing Floor

Carefully examine the existing flooring material for any signs of wear, damage, or water intrusion. Check the subfloor's condition by looking for loose boards, squeaks, or any soft spots that indicate rot or structural weakness. Measure the floor to ensure it is level within the manufacturer's tolerance for the new flooring. Identify any transitions to other flooring types and plan how they will be handled.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Assess Existing Floor

Carefully examine the existing flooring material for any signs of wear, damage, or water intrusion. Check the subfloor's condition by looking for loose boards, squeaks, or any soft spots that indicate rot or structural weakness. Measure the floor to ensure it is level within the manufacturer's tolerance for the new flooring. Identify any transitions to other flooring types and plan how they will be handled.

Videos for this step

Assess Floor ImperfectionsEnsure Subfloor is LevelCheck Existing Floor for Flatness

Tools and Materials

← Project

Flooring & Tiling

Step 1 of 11·22.4 hr left

1
Assess Existing Floor
60 minutes6 items
2
Remove Existing Flooring and Trim
180 minutes7 items
3
Prepare the Subfloor
240 minutes8 items
4
Acclimate Flooring Materials
10 minutes2 items
5
Lay Out Flooring
45 minutes2 items
6
Install First Row of Flooring
90 minutes7 items
7
Continue Laying Rows
360 minutes8 items
8
Cut Around Obstacles
120 minutes6 items
9
Install Final Row
60 minutes5 items
10
Install Transition Strips and Trim
120 minutes9 items
11
Clean Up and Final Inspection
60 minutes5 items