Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 5 · Lay Out Flooring

Determine the starting wall. For most flooring, it's recommended to start along the longest, straightest wall. Lay out the first few rows of flooring perpendicular to the direction of the main light source in the room (e.g., a window) to minimize the visibility of seams. Dry-lay a few planks or tiles to visualize the pattern and ensure a pleasing arrangement, especially around doorways or irregular shapes.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Lay Out Flooring

Determine the starting wall. For most flooring, it's recommended to start along the longest, straightest wall. Lay out the first few rows of flooring perpendicular to the direction of the main light source in the room (e.g., a window) to minimize the visibility of seams. Dry-lay a few planks or tiles to visualize the pattern and ensure a pleasing arrangement, especially around doorways or irregular shapes.

Videos for this step

Plan Flooring Layout & Establish Start PointPlan Plank Direction and Measure RoomDetermine Flooring Direction

Tools and Materials

← Project

Flooring & Tiling

Step 5 of 11·14.3 hr left

Assess Existing Floor
60 minutes6 items
Remove Existing Flooring and Trim
180 minutes7 items
Prepare the Subfloor
240 minutes8 items
Acclimate Flooring Materials
10 minutes2 items
5
Lay Out Flooring
45 minutes2 items
6
Install First Row of Flooring
90 minutes7 items
7
Continue Laying Rows
360 minutes8 items
8
Cut Around Obstacles
120 minutes6 items
9
Install Final Row
60 minutes5 items
10
Install Transition Strips and Trim
120 minutes9 items
11
Clean Up and Final Inspection
60 minutes5 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.