Step 7 · Install Beams

Cut the beams (typically doubled-up 2x lumber) to the required lengths. Lift the beams into place and rest them on top of the posts (if using post caps) or attach them to the sides of the posts using appropriate connectors and fasteners. Ensure the beams are level and properly aligned. If the deck spans across beams, ensure they are adequately sized for the span and load.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Install Beams

Cut the beams (typically doubled-up 2x lumber) to the required lengths. Lift the beams into place and rest them on top of the posts (if using post caps) or attach them to the sides of the posts using appropriate connectors and fasteners. Ensure the beams are level and properly aligned. If the deck spans across beams, ensure they are adequately sized for the span and load.

Videos for this step

Assemble and Secure BeamsSetting Main Support BeamsInstall Main Support Beams

Tools and Materials

← Project

Deck Construction

Step 7 of 13·65 hr left

Obtain Permits and Understand Local Codes
600 minutes2 items
Design and Plan the Deck
480 minutes4 items
Layout and Excavate Footings
720 minutes6 items
Pour Concrete Footings
480 minutes8 items
Install Post Anchors and Posts
360 minutes7 items
Install Ledger Board (if applicable)
360 minutes8 items
7
Install Beams
300 minutes6 items
8
Install Joists
720 minutes8 items
9
Install Decking
960 minutes7 items
10
Build and Install Railings
720 minutes9 items
11
Build and Install Stairs (if applicable)
600 minutes8 items
12
Apply Finishing Touches
360 minutes5 items
13
Final Inspection and Cleanup
240 minutes3 items