Step 13 · Final Inspection and Cleanup

Walk the entire deck, checking all connections, fasteners, and structural components to ensure they are secure and properly installed. Test railings and stairs for stability. Remove all tools, materials, and debris from the construction site. Dispose of waste materials properly.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 13 · Final Inspection and Cleanup

Walk the entire deck, checking all connections, fasteners, and structural components to ensure they are secure and properly installed. Test railings and stairs for stability. Remove all tools, materials, and debris from the construction site. Dispose of waste materials properly.

Videos for this step

Final Clean-up and InspectionComplete Trim and Final CleanupFinal Review and Project Cleanup

Tools and Materials

← Project

Deck Construction

Step 13 of 13·4 hr left

Obtain Permits and Understand Local Codes
600 minutes2 items
Design and Plan the Deck
480 minutes4 items
Layout and Excavate Footings
720 minutes6 items
Pour Concrete Footings
480 minutes8 items
Install Post Anchors and Posts
360 minutes7 items
Install Ledger Board (if applicable)
360 minutes8 items
Install Beams
300 minutes6 items
Install Joists
720 minutes8 items
Install Decking
960 minutes7 items
Build and Install Railings
720 minutes9 items
Build and Install Stairs (if applicable)
600 minutes8 items
Apply Finishing Touches
360 minutes5 items
13
Final Inspection and Cleanup
240 minutes3 items