Step 5 · Install Post Anchors and Posts

Once the concrete footings have fully cured, attach appropriate post anchors (e.g., J-bolts embedded in concrete, or post bases that sit on the concrete). Ensure the anchors are centered and level. Cut the deck posts (typically 4x4 or 6x6 pressure-treated lumber) to the required height, accounting for the beam and joist assembly. Securely fasten the posts to the anchors using specified fasteners, ensuring they are plumb.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Install Post Anchors and Posts

Once the concrete footings have fully cured, attach appropriate post anchors (e.g., J-bolts embedded in concrete, or post bases that sit on the concrete). Ensure the anchors are centered and level. Cut the deck posts (typically 4x4 or 6x6 pressure-treated lumber) to the required height, accounting for the beam and joist assembly. Securely fasten the posts to the anchors using specified fasteners, ensuring they are plumb.

Videos for this step

Install Deck PostsInstalling Support Posts with Post BasesAttach Post Bases and Set Posts

Tools and Materials

← Project

Deck Construction

Step 5 of 13·77 hr left

Obtain Permits and Understand Local Codes
600 minutes2 items
Design and Plan the Deck
480 minutes4 items
Layout and Excavate Footings
720 minutes6 items
Pour Concrete Footings
480 minutes8 items
5
Install Post Anchors and Posts
360 minutes7 items
6
Install Ledger Board (if applicable)
360 minutes8 items
7
Install Beams
300 minutes6 items
8
Install Joists
720 minutes8 items
9
Install Decking
960 minutes7 items
10
Build and Install Railings
720 minutes9 items
11
Build and Install Stairs (if applicable)
600 minutes8 items
12
Apply Finishing Touches
360 minutes5 items
13
Final Inspection and Cleanup
240 minutes3 items