Step 4 · Pour Concrete Footings

Place concrete form tubes (Sonotubes) into the excavated footing holes, ensuring they are plumb and centered. Mix concrete according to the manufacturer's instructions or have ready-mix delivered. Pour the concrete into the forms, using a piece of rebar or a stick to consolidate the concrete and remove air pockets. Level the top of the concrete to the desired height, often with a slight crown to direct water away.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Pour Concrete Footings

Place concrete form tubes (Sonotubes) into the excavated footing holes, ensuring they are plumb and centered. Mix concrete according to the manufacturer's instructions or have ready-mix delivered. Pour the concrete into the forms, using a piece of rebar or a stick to consolidate the concrete and remove air pockets. Level the top of the concrete to the desired height, often with a slight crown to direct water away.

Videos for this step

Pour Concrete FootingsPour Concrete and Finish Footing TopsPour Concrete Footings and Install Anchors

Tools and Materials

← Project

Deck Construction

Step 4 of 13·85 hr left

Obtain Permits and Understand Local Codes
600 minutes2 items
Design and Plan the Deck
480 minutes4 items
Layout and Excavate Footings
720 minutes6 items
4
Pour Concrete Footings
480 minutes8 items
5
Install Post Anchors and Posts
360 minutes7 items
6
Install Ledger Board (if applicable)
360 minutes8 items
7
Install Beams
300 minutes6 items
8
Install Joists
720 minutes8 items
9
Install Decking
960 minutes7 items
10
Build and Install Railings
720 minutes9 items
11
Build and Install Stairs (if applicable)
600 minutes8 items
12
Apply Finishing Touches
360 minutes5 items
13
Final Inspection and Cleanup
240 minutes3 items