Step 2 · Excavate for Step Frames

Excavate the ground along the marked lines for each step frame. The excavation depth should accommodate the height of the timber frame and allow for a level base. Ensure the sides of the excavation are relatively vertical to support the timber frame.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Excavate for Step Frames

Excavate the ground along the marked lines for each step frame. The excavation depth should accommodate the height of the timber frame and allow for a level base. Ensure the sides of the excavation are relatively vertical to support the timber frame.

Videos for this step

Excavate Pathway TrenchExcavate TerracesClear & Level First Step Area

Tools and Materials

← Project

How to Build Timber and Gravel Steps on a Slope

Step 2 of 8·13.5 hr left

Mark the Step Locations
60 minutes4 items
2
Excavate for Step Frames
180 minutes4 items
3
Cut Timber Frame Components
90 minutes4 items
4
Assemble and Position Step Frames
120 minutes5 items
5
Install Support Stakes
90 minutes3 items
6
Fill Frames with Gravel
180 minutes4 items
7
Add Decorative Top Layer (Optional)
60 minutes3 items
8
Backfill and Landscape Edges
90 minutes4 items