Step 4 · Assemble and Position Step Frames

Assemble the cut timber pieces for each step frame using exterior-grade screws or nails. Once assembled, carefully place each frame into its corresponding excavation. Use a level to ensure the top of the frame is horizontal and that it is securely seated on the ground. Adjust the excavation or add/remove soil as needed for proper leveling.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Assemble and Position Step Frames

Assemble the cut timber pieces for each step frame using exterior-grade screws or nails. Once assembled, carefully place each frame into its corresponding excavation. Use a level to ensure the top of the frame is horizontal and that it is securely seated on the ground. Adjust the excavation or add/remove soil as needed for proper leveling.

Videos for this step

Construct and Place First Step FrameAssemble Lower Step FrameAssemble and Level the First Step Frame

Tools and Materials

← Project

How to Build Timber and Gravel Steps on a Slope

Step 4 of 8·9 hr left

Mark the Step Locations
60 minutes4 items
Excavate for Step Frames
180 minutes4 items
Cut Timber Frame Components
90 minutes4 items
4
Assemble and Position Step Frames
120 minutes5 items
5
Install Support Stakes
90 minutes3 items
6
Fill Frames with Gravel
180 minutes4 items
7
Add Decorative Top Layer (Optional)
60 minutes3 items
8
Backfill and Landscape Edges
90 minutes4 items