Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 6 · Fill Frames with Gravel

Begin filling the interior of each timber step frame with gravel. Add gravel in layers of a few inches at a time, compacting each layer firmly with a tamper or by stepping on it. This creates a stable, walkable surface for the steps. Continue filling until the gravel is flush with the top of the timber frame.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Fill Frames with Gravel

Begin filling the interior of each timber step frame with gravel. Add gravel in layers of a few inches at a time, compacting each layer firmly with a tamper or by stepping on it. This creates a stable, walkable surface for the steps. Continue filling until the gravel is flush with the top of the timber frame.

Videos for this step

Fill Steps with GravelFill Steps with GravelFill with Gravel

Tools and Materials

← Project

How to Build Timber and Gravel Steps on a Slope

Step 6 of 8·5.5 hr left

Mark the Step Locations
60 minutes4 items
Excavate for Step Frames
180 minutes4 items
Cut Timber Frame Components
90 minutes4 items
Assemble and Position Step Frames
120 minutes5 items
Install Support Stakes
90 minutes3 items
6
Fill Frames with Gravel
180 minutes4 items
7
Add Decorative Top Layer (Optional)
60 minutes3 items
8
Backfill and Landscape Edges
90 minutes4 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.