Step 8 · Backfill and Landscape Edges
Use the excavated soil to backfill any voids between the timber frames and the excavated trench. Slope the soil away from the frames to promote drainage. Tidy up the edges of the steps, ensuring a clean transition from the steps to the surrounding ground or landscape. Remove any excess materials from the work area.
Tools and Materials
PrevNext