Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 8 · Backfill and Landscape Edges

Use the excavated soil to backfill any voids between the timber frames and the excavated trench. Slope the soil away from the frames to promote drainage. Tidy up the edges of the steps, ensuring a clean transition from the steps to the surrounding ground or landscape. Remove any excess materials from the work area.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 8 · Backfill and Landscape Edges

Use the excavated soil to backfill any voids between the timber frames and the excavated trench. Slope the soil away from the frames to promote drainage. Tidy up the edges of the steps, ensuring a clean transition from the steps to the surrounding ground or landscape. Remove any excess materials from the work area.

Videos for this step

Backfill and Place Decorative RocksBackfill and Compact TreadExcavate and Install Frames

Tools and Materials

← Project

How to Build Timber and Gravel Steps on a Slope

Step 8 of 8·1.5 hr left

Mark the Step Locations
60 minutes4 items
Excavate for Step Frames
180 minutes4 items
Cut Timber Frame Components
90 minutes4 items
Assemble and Position Step Frames
120 minutes5 items
Install Support Stakes
90 minutes3 items
Fill Frames with Gravel
180 minutes4 items
Add Decorative Top Layer (Optional)
60 minutes3 items
8
Backfill and Landscape Edges
90 minutes4 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.