Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 1 · Mark the Step Locations

Using stakes and string lines, carefully mark the intended positions and dimensions of each timber step frame on the slope. Ensure the lines are level and that the spacing between steps accounts for the desired rise and tread depth.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Mark the Step Locations

Using stakes and string lines, carefully mark the intended positions and dimensions of each timber step frame on the slope. Ensure the lines are level and that the spacing between steps accounts for the desired rise and tread depth.

Videos for this step

Site Preparation and MeasurementExtend the Staircase with Subsequent StepsContinue Building Steps Up the Hillside

Tools and Materials

← Project

How to Build Timber and Gravel Steps on a Slope

Step 1 of 8·14.5 hr left

1
Mark the Step Locations
60 minutes4 items
2
Excavate for Step Frames
180 minutes4 items
3
Cut Timber Frame Components
90 minutes4 items
4
Assemble and Position Step Frames
120 minutes5 items
5
Install Support Stakes
90 minutes3 items
6
Fill Frames with Gravel
180 minutes4 items
7
Add Decorative Top Layer (Optional)
60 minutes3 items
8
Backfill and Landscape Edges
90 minutes4 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.