Clear & Level First Step Area — Excavate for Step Frames

Beginner3 mins

Part of project

How to Build Timber and Gravel Steps on a Slope · Step 2 of 8

Helpful?

In this video

After the initial frame for the first step is partially assembled, the builder uses a shovel to clear debris and level the ground within the step's footprint. He then uses a level to verify the horizontal alignment of the installed lumber frame, making minor adjustments as needed. He emphasizes that the first step is usually the hardest to get right.

319.3K views4.7K
Transcript
Hide

it right there. 6-in lag bolts. Exterior grade. There's got to be an easier way to do this. I'm going to need a shovel. Clear that up. Might be up there. Okay, that was simple enough. First one should always be the hardest. Do hammer. Probably see if it's level pretty good. Is it lunch time yet? Big old auger bit. 1/2 in stakes. keep it from moving. I've actually never tried it. That's an interesting