Step 7 · Connect Water Lines

Connect the cold water supply line and the hot water outlet line to the corresponding ports on the new water heater. Use pipe thread sealant (pipe dope) or PTFE tape on the male threads of the fittings or nipples to ensure a watertight seal. Hand-tighten the connections, then use an adjustable wrench to snug them up – typically about a quarter to a half turn past hand-tight. Avoid over-tightening, which can damage the fittings or the tank threads. Some installations may require flexible water connectors for easier installation and to absorb vibrations.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Connect Water Lines

Connect the cold water supply line and the hot water outlet line to the corresponding ports on the new water heater. Use pipe thread sealant (pipe dope) or PTFE tape on the male threads of the fittings or nipples to ensure a watertight seal. Hand-tighten the connections, then use an adjustable wrench to snug them up – typically about a quarter to a half turn past hand-tight. Avoid over-tightening, which can damage the fittings or the tank threads. Some installations may require flexible water connectors for easier installation and to absorb vibrations.

Videos for this step

Connect Water and Gas LinesConnect Water SupplyConnect Water Supply

Tools and Materials

← Project

Water Heater Installation

Step 7 of 13·3.9 hr left

Turn Off Utilities
15 minutes2 items
Drain the Old Water Heater
60 minutes3 items
Disconnect Plumbing and Venting
30 minutes3 items
Remove Old Water Heater
20 minutes2 items
Prepare the Installation Area
30 minutes2 items
Position the New Water Heater
20 minutes2 items
7
Connect Water Lines
30 minutes3 items
8
Connect Gas Line and Venting (Gas Heaters)
45 minutes5 items
9
Connect Electrical Wiring (Electric Heaters)
30 minutes3 items
10
Fill the New Water Heater
20 minutes1 items
11
Restore Utilities and Test
60 minutes2 items
12
Install Temperature and Pressure Relief Valve (T&P Valve)
20 minutes3 items
13
Final Inspection and Cleanup
30 minutes1 items