Step 13 · Final Inspection and Cleanup
Conduct a thorough inspection of the entire installation. Double-check all water, gas, and electrical connections for any signs of leaks or loose fittings. Ensure the vent system is properly connected and secure. Verify that the T&P valve and its discharge pipe are correctly installed. Clean up the work area, removing any tools, debris, and old parts. Dispose of the old water heater and any packaging materials according to local regulations for large appliance disposal.
Tools and Materials
PrevNext