Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 12 · Install Temperature and Pressure Relief Valve (T&P Valve)

Install the new T&P relief valve into the designated port on the water heater. Use pipe thread sealant on the threads of the valve to ensure a watertight seal. Tighten the valve securely with an adjustable wrench. Following local codes, attach a discharge pipe to the outlet of the T&P valve. This pipe must be made of approved material (usually copper or CPVC), be sized correctly, and run downhill to a suitable drainage point (like a floor drain or indirect waste receptor) or to within 6 inches of the floor. Do not cap, plug, or thread the end of the discharge pipe.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 12 · Install Temperature and Pressure Relief Valve (T&P Valve)

Install the new T&P relief valve into the designated port on the water heater. Use pipe thread sealant on the threads of the valve to ensure a watertight seal. Tighten the valve securely with an adjustable wrench. Following local codes, attach a discharge pipe to the outlet of the T&P valve. This pipe must be made of approved material (usually copper or CPVC), be sized correctly, and run downhill to a suitable drainage point (like a floor drain or indirect waste receptor) or to within 6 inches of the floor. Do not cap, plug, or thread the end of the discharge pipe.

Videos for this step

Install T&P Discharge PipeInstall T&P Valve and Drain LineInstall T&P Valve and Water Connections

Tools and Materials

← Project

Water Heater Installation

Step 12 of 13·50 min left

Turn Off Utilities
15 minutes2 items
Drain the Old Water Heater
60 minutes3 items
Disconnect Plumbing and Venting
30 minutes3 items
Remove Old Water Heater
20 minutes2 items
Prepare the Installation Area
30 minutes2 items
Position the New Water Heater
20 minutes2 items
Connect Water Lines
30 minutes3 items
Connect Gas Line and Venting (Gas Heaters)
45 minutes5 items
Connect Electrical Wiring (Electric Heaters)
30 minutes3 items
Fill the New Water Heater
20 minutes1 items
Restore Utilities and Test
60 minutes2 items
12
Install Temperature and Pressure Relief Valve (T&P Valve)
20 minutes3 items
13
Final Inspection and Cleanup
30 minutes1 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.