Step 5 · Check for Sag and Vibration

Once initial tension is applied, gently push or pluck the cable at its midpoint. A properly tensioned cable should have minimal sag and a high-pitched 'ping' when plucked, indicating it is firm. If there is significant sagging or a dull thud, additional tension is required. Conversely, if the cable feels extremely rigid and seems to be pulling excessively on the posts, it may be over-tensioned.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Check for Sag and Vibration

Once initial tension is applied, gently push or pluck the cable at its midpoint. A properly tensioned cable should have minimal sag and a high-pitched 'ping' when plucked, indicating it is firm. If there is significant sagging or a dull thud, additional tension is required. Conversely, if the cable feels extremely rigid and seems to be pulling excessively on the posts, it may be over-tensioned.

Videos for this step

Tension the CablesTension CablesHand-Tighten and Seat Cables

Tools and Materials

← Project

How to Tension and Adjust Stair Cable Railing

Step 5 of 8·55 min left

Initial Cable Engagement
30 minutes3 items
Attach Tensioning Fitting to First Cable End
20 minutes3 items
Install Tensioning Device at Opposite End
25 minutes3 items
Initial Cable Tensioning
15 minutes2 items
5
Check for Sag and Vibration
10 minutes1 items
6
Fine-Tuning Tension
20 minutes2 items
7
Secure Tensioning Device
10 minutes3 items
8
Final Inspection and Trim Excess Cable
15 minutes3 items