Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 3 · Install Tensioning Device at Opposite End

At the opposite end of the cable run (the ending post), install the tensioning mechanism. This could be a turnbuckle, which screws into a fixed point and allows for adjustment by rotating its body, or a threaded rod that passes through the post and is secured with nuts. Ensure the tensioning device is securely anchored to the post or an appropriate structural support. Leave the device in a neutral or slightly loosened state initially.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Install Tensioning Device at Opposite End

At the opposite end of the cable run (the ending post), install the tensioning mechanism. This could be a turnbuckle, which screws into a fixed point and allows for adjustment by rotating its body, or a threaded rod that passes through the post and is secured with nuts. Ensure the tensioning device is securely anchored to the post or an appropriate structural support. Leave the device in a neutral or slightly loosened state initially.

Videos for this step

Install Tensioning TerminalAttaching and Initial Tightening of Tensioning TerminalsTighten Cable Tensioners

Tools and Materials

← Project

How to Tension and Adjust Stair Cable Railing

Step 3 of 8·1.6 hr left

Initial Cable Engagement
30 minutes3 items
Attach Tensioning Fitting to First Cable End
20 minutes3 items
3
Install Tensioning Device at Opposite End
25 minutes3 items
4
Initial Cable Tensioning
15 minutes2 items
5
Check for Sag and Vibration
10 minutes1 items
6
Fine-Tuning Tension
20 minutes2 items
7
Secure Tensioning Device
10 minutes3 items
8
Final Inspection and Trim Excess Cable
15 minutes3 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.