Step 1 · Initial Cable Engagement

Begin by carefully threading the stainless steel cable through the designated holes or channels in the starting post. Ensure the cable runs smoothly without kinks or sharp bends. Continue guiding the cable through each subsequent intermediate post, maintaining a consistent path along the staircase. Leave approximately 6-12 inches of extra cable at both the starting and ending posts to facilitate tensioning and secure attachment. This initial slack is crucial for making adjustments later.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Initial Cable Engagement

Begin by carefully threading the stainless steel cable through the designated holes or channels in the starting post. Ensure the cable runs smoothly without kinks or sharp bends. Continue guiding the cable through each subsequent intermediate post, maintaining a consistent path along the staircase. Leave approximately 6-12 inches of extra cable at both the starting and ending posts to facilitate tensioning and secure attachment. This initial slack is crucial for making adjustments later.

Videos for this step

Thread and Cut CablesThread Cable RailingUncoiling and Initial Cable Threading

Tools and Materials

← Project

How to Tension and Adjust Stair Cable Railing

Step 1 of 8·2.4 hr left

1
Initial Cable Engagement
30 minutes3 items
2
Attach Tensioning Fitting to First Cable End
20 minutes3 items
3
Install Tensioning Device at Opposite End
25 minutes3 items
4
Initial Cable Tensioning
15 minutes2 items
5
Check for Sag and Vibration
10 minutes1 items
6
Fine-Tuning Tension
20 minutes2 items
7
Secure Tensioning Device
10 minutes3 items
8
Final Inspection and Trim Excess Cable
15 minutes3 items