Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 7 · Leak Test

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Re-install the valve cartridge you removed before soldering. Ensure the hot/cold orientation is correct. With the shower valve in the 'off' position, go to the main shutoff and turn the water back on SLOWLY. Return to the shower and use a flashlight to meticulously inspect every new solder joint for any signs of dripping or weeping. If all joints are dry, turn the shower valve on to test its function and to pressurize the outlet connections. Check again for leaks. If any leak is found, you must shut off the water, drain the system, and re-solder the faulty joint.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Leak Test

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Re-install the valve cartridge you removed before soldering. Ensure the hot/cold orientation is correct. With the shower valve in the 'off' position, go to the main shutoff and turn the water back on SLOWLY. Return to the shower and use a flashlight to meticulously inspect every new solder joint for any signs of dripping or weeping. If all joints are dry, turn the shower valve on to test its function and to pressurize the outlet connections. Check again for leaks. If any leak is found, you must shut off the water, drain the system, and re-solder the faulty joint.

Videos for this step

Test for LeaksTest the New FixturesCool, Clean, and Test

Tools and Materials

← Project

How to Replace a Shower Valve Through a Tiled Wall

Step 7 of 11·2.3 hr left

Preparation and Water Shut-off
20 mins2 itemsBeginner
Remove Old Trim
15 mins4 itemsBeginner
Create Tile Access Opening
60 mins9 items
Remove Old Shower Valve
45 mins4 itemsAdvanced
Prepare and Dry-Fit New Valve
45 mins9 itemsAdvanced
Solder New Valve
60 mins9 items
7
Leak Test
20 mins9 itemsIntermediate
8
Repair the Wall
40 mins7 itemsAdvanced
9
Install New Tile
30 mins6 items
10
Grout and Seal
30 mins10 itemsAdvanced
11
Install New Trim and Final Test
20 mins3 itemsIntermediate
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.