Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 3 · Create Tile Access Opening

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

This is the most critical and delicate step. Measure the escutcheon plate of the NEW valve. Mark a cutting area on the tile that is slightly smaller than the new plate so it will cover the hole. If possible, align your cuts with existing grout lines. Put on your safety glasses, dust mask, and hearing protection. Use an angle grinder equipped with a diamond blade to slowly and carefully cut along your marked lines. Once the tile is cut, use a hammer and a small chisel to gently tap out the cut tile piece(s). Then, cut and remove the backer board behind the tile to fully expose the old valve and surrounding pipes.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Create Tile Access Opening

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

This is the most critical and delicate step. Measure the escutcheon plate of the NEW valve. Mark a cutting area on the tile that is slightly smaller than the new plate so it will cover the hole. If possible, align your cuts with existing grout lines. Put on your safety glasses, dust mask, and hearing protection. Use an angle grinder equipped with a diamond blade to slowly and carefully cut along your marked lines. Once the tile is cut, use a hammer and a small chisel to gently tap out the cut tile piece(s). Then, cut and remove the backer board behind the tile to fully expose the old valve and surrounding pipes.

Videos for this step

Removing Old Shower TrimCreate an Access PanelClean the Tile Surface

Tools and Materials

← Project

How to Replace a Shower Valve Through a Tiled Wall

Step 3 of 11·5.8 hr left

Preparation and Water Shut-off
20 mins2 itemsBeginner
Remove Old Trim
15 mins4 itemsBeginner
3
Create Tile Access Opening
60 mins9 items
4
Remove Old Shower Valve
45 mins4 itemsAdvanced
5
Prepare and Dry-Fit New Valve
45 mins9 itemsAdvanced
6
Solder New Valve
60 mins9 items
7
Leak Test
20 mins9 itemsIntermediate
8
Repair the Wall
40 mins7 itemsAdvanced
9
Install New Tile
30 mins6 items
10
Grout and Seal
30 mins10 itemsAdvanced
11
Install New Trim and Final Test
20 mins3 itemsIntermediate
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.