Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 5 · Prepare and Dry-Fit New Valve

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Prepare the cut ends of the existing copper pipes. Use a deburring tool to smooth the inside edge of each pipe, then thoroughly clean the outside of the pipes (about 1 inch from the end) with sand cloth or a fitting brush until they are bright and shiny. Do the same for the inside of the new copper fittings. Temporarily assemble the new valve with any necessary couplings and pipes (this is called 'dry-fitting'). Use the manufacturer's included plaster guard or template to position the valve at the correct depth relative to the front surface of the tile. Secure the valve to the wood stringer in the wall with screws.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Prepare and Dry-Fit New Valve

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Prepare the cut ends of the existing copper pipes. Use a deburring tool to smooth the inside edge of each pipe, then thoroughly clean the outside of the pipes (about 1 inch from the end) with sand cloth or a fitting brush until they are bright and shiny. Do the same for the inside of the new copper fittings. Temporarily assemble the new valve with any necessary couplings and pipes (this is called 'dry-fitting'). Use the manufacturer's included plaster guard or template to position the valve at the correct depth relative to the front surface of the tile. Secure the valve to the wood stringer in the wall with screws.

Videos for this step

Install Shutoff and Rebuild RiserMeasure and Prepare for Valve InstallationPipe and Fitting Preparation

Tools and Materials

← Project

How to Replace a Shower Valve Through a Tiled Wall

Step 5 of 11·4.1 hr left

Preparation and Water Shut-off
20 mins2 itemsBeginner
Remove Old Trim
15 mins4 itemsBeginner
Create Tile Access Opening
60 mins9 items
Remove Old Shower Valve
45 mins4 itemsAdvanced
5
Prepare and Dry-Fit New Valve
45 mins9 itemsAdvanced
6
Solder New Valve
60 mins9 items
7
Leak Test
20 mins9 itemsIntermediate
8
Repair the Wall
40 mins7 itemsAdvanced
9
Install New Tile
30 mins6 items
10
Grout and Seal
30 mins10 itemsAdvanced
11
Install New Trim and Final Test
20 mins3 itemsIntermediate
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.