Step 8 · Cure the Epoxy

This is a critical step. The epoxy needs time to fully harden and achieve its designed strength and chemical resistance. Follow the manufacturer's recommended cure times for light foot traffic (typically 24-72 hours) and for vehicle traffic or heavy load bearing (often 5-7 days or longer). Ensure the environment remains at the recommended temperature and humidity range during the curing process.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 8 · Cure the Epoxy

This is a critical step. The epoxy needs time to fully harden and achieve its designed strength and chemical resistance. Follow the manufacturer's recommended cure times for light foot traffic (typically 24-72 hours) and for vehicle traffic or heavy load bearing (often 5-7 days or longer). Ensure the environment remains at the recommended temperature and humidity range during the curing process.

Videos for this step

Allow Epoxy to CureAllow for Proper CuringAllow to Cure and Final Inspection

← Project

Epoxy Floor Coating

Step 8 of 8·2.8 hr left

Clean the Concrete Floor
180 minutes8 items
Etch the Concrete Surface
120 minutes10 items
Repair Cracks and Pits
60 minutes4 items
Prime the Concrete (if recommended)
90 minutes5 items
Mix the Epoxy Coating
20 minutes5 items
Apply the Epoxy Coating
240 minutes6 items
Apply Topcoat (if applicable)
120 minutes5 items
8
Cure the Epoxy
168 minutes