Step 5 · Mix the Epoxy Coating

Epoxy coatings are typically a two-part system (Part A and Part B). It is critical to measure the components accurately by volume or weight as specified. Pour Part B into Part A (or vice-versa, as directed). Mix thoroughly with a drill equipped with a mixing paddle for the time recommended by the manufacturer (usually 2-3 minutes). Be sure to scrape the sides and bottom of the container to ensure all material is incorporated. Once mixed, the epoxy has a limited pot life, so have everything ready for application.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Mix the Epoxy Coating

Epoxy coatings are typically a two-part system (Part A and Part B). It is critical to measure the components accurately by volume or weight as specified. Pour Part B into Part A (or vice-versa, as directed). Mix thoroughly with a drill equipped with a mixing paddle for the time recommended by the manufacturer (usually 2-3 minutes). Be sure to scrape the sides and bottom of the container to ensure all material is incorporated. Once mixed, the epoxy has a limited pot life, so have everything ready for application.

Videos for this step

Mix the Epoxy CoatingMixing Epoxy Base CoatMix Epoxy Base Coat

Tools and Materials

← Project

Epoxy Floor Coating

Step 5 of 8·9.1 hr left

Clean the Concrete Floor
180 minutes8 items
Etch the Concrete Surface
120 minutes10 items
Repair Cracks and Pits
60 minutes4 items
Prime the Concrete (if recommended)
90 minutes5 items
5
Mix the Epoxy Coating
20 minutes5 items
6
Apply the Epoxy Coating
240 minutes6 items
7
Apply Topcoat (if applicable)
120 minutes5 items
8
Cure the Epoxy
168 minutes