Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 7 · Apply Topcoat (if applicable)

Some epoxy systems benefit from or require a clear topcoat, such as a polyurethane or polyaspartic, for added scratch resistance, UV stability, or gloss. Follow the manufacturer's instructions for the curing time of the base epoxy before applying the topcoat. Mix and apply the topcoat using similar methods as the base epoxy (squeegee and roller), ensuring even coverage.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Apply Topcoat (if applicable)

Some epoxy systems benefit from or require a clear topcoat, such as a polyurethane or polyaspartic, for added scratch resistance, UV stability, or gloss. Follow the manufacturer's instructions for the curing time of the base epoxy before applying the topcoat. Mix and apply the topcoat using similar methods as the base epoxy (squeegee and roller), ensuring even coverage.

Videos for this step

Mix and Apply Urethane Top CoatScrape Excess Chips and Apply Clear TopcoatApplying Protective Urethane Top Coat

Tools and Materials

← Project

Epoxy Floor Coating

Step 7 of 8·4.8 hr left

Clean the Concrete Floor
180 minutes8 items
Etch the Concrete Surface
120 minutes10 items
Repair Cracks and Pits
60 minutes4 items
Prime the Concrete (if recommended)
90 minutes5 items
Mix the Epoxy Coating
20 minutes5 items
Apply the Epoxy Coating
240 minutes6 items
7
Apply Topcoat (if applicable)
120 minutes5 items
8
Cure the Epoxy
168 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.