Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 2 · Etch the Concrete Surface

If using an etching solution, follow the manufacturer's instructions carefully. Usually, this involves diluting the solution, spreading it over the damp concrete, allowing it to foam for a specified time, scrubbing it in, and then rinsing thoroughly with clean water until all etching solution residue is removed. If mechanical grinding, use a diamond grinder with appropriate dust collection. The goal is to open the pores of the concrete, creating a surface similar in texture to 100-grit sandpaper.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Etch the Concrete Surface

If using an etching solution, follow the manufacturer's instructions carefully. Usually, this involves diluting the solution, spreading it over the damp concrete, allowing it to foam for a specified time, scrubbing it in, and then rinsing thoroughly with clean water until all etching solution residue is removed. If mechanical grinding, use a diamond grinder with appropriate dust collection. The goal is to open the pores of the concrete, creating a surface similar in texture to 100-grit sandpaper.

Videos for this step

Apply Etch and ScrubScrub Acid Etch into ConcreteEtch Surface

Tools and Materials

← Project

Epoxy Floor Coating

Step 2 of 8·13.6 hr left

Clean the Concrete Floor
180 minutes8 items
2
Etch the Concrete Surface
120 minutes10 items
3
Repair Cracks and Pits
60 minutes4 items
4
Prime the Concrete (if recommended)
90 minutes5 items
5
Mix the Epoxy Coating
20 minutes5 items
6
Apply the Epoxy Coating
240 minutes6 items
7
Apply Topcoat (if applicable)
120 minutes5 items
8
Cure the Epoxy
168 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.