Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 5 · Dry Fit New Treads

Carefully place each new tread onto its corresponding existing tread. Check for a snug fit against the risers and any adjacent vertical surfaces. Ensure the waterfall overhang is correctly positioned and that the tread sits level. Make any minor adjustments by carefully trimming or sanding edges as needed to achieve a perfect fit. This step is critical to avoid costly mistakes during the adhesive and fastening stage.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Dry Fit New Treads

Carefully place each new tread onto its corresponding existing tread. Check for a snug fit against the risers and any adjacent vertical surfaces. Ensure the waterfall overhang is correctly positioned and that the tread sits level. Make any minor adjustments by carefully trimming or sanding edges as needed to achieve a perfect fit. This step is critical to avoid costly mistakes during the adhesive and fastening stage.

Videos for this step

Dry-Fit and Test TreadsInstall First TreadInstall New Treads and Secure with Shims/Glue/Nails

Tools and Materials

← Project

How to Cover Waterfall-Style Stairs with Treads

Step 5 of 9·7.3 hr left

Inspect Existing Treads and Risers
30 minutes3 items
Measure and Template for New Treads
45 minutes4 items
Cut New Treads
90 minutes4 items
Prepare Existing Surfaces
60 minutes5 items
5
Dry Fit New Treads
30 minutes1 items
6
Apply Adhesive and Fasteners
120 minutes8 items
7
Install Waterfall Risers/Returns (if applicable)
60 minutes7 items
8
Fill and Sand Fastener Holes
45 minutes5 items
9
Apply Finish to Treads
180 minutes7 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.