Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 8 · Fill and Sand Fastener Holes

Using a putty knife, fill all pre-drilled screw holes and nail holes with a color-matched wood filler or a universal wood filler that can be stained. Allow the filler to dry completely according to the manufacturer's instructions. Once dry, lightly sand the filled areas until they are flush and smooth with the surrounding tread surface. Then, sand the entire surface of all newly installed treads to ensure a uniform smoothness, paying attention to edges and any rough spots. Feather sand any areas where new treads meet existing ones.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 8 · Fill and Sand Fastener Holes

Using a putty knife, fill all pre-drilled screw holes and nail holes with a color-matched wood filler or a universal wood filler that can be stained. Allow the filler to dry completely according to the manufacturer's instructions. Once dry, lightly sand the filled areas until they are flush and smooth with the surrounding tread surface. Then, sand the entire surface of all newly installed treads to ensure a uniform smoothness, paying attention to edges and any rough spots. Feather sand any areas where new treads meet existing ones.

Videos for this step

Fill Gaps and Nail HolesApply Wood Filler and SandFill and Sand Wood Surfaces

Tools and Materials

← Project

How to Cover Waterfall-Style Stairs with Treads

Step 8 of 9·3.8 hr left

Inspect Existing Treads and Risers
30 minutes3 items
Measure and Template for New Treads
45 minutes4 items
Cut New Treads
90 minutes4 items
Prepare Existing Surfaces
60 minutes5 items
Dry Fit New Treads
30 minutes1 items
Apply Adhesive and Fasteners
120 minutes8 items
Install Waterfall Risers/Returns (if applicable)
60 minutes7 items
8
Fill and Sand Fastener Holes
45 minutes5 items
9
Apply Finish to Treads
180 minutes7 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.