Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 6 · Apply Adhesive and Fasteners

Apply a generous bead of high-quality construction adhesive to the back of each new tread. Spread the adhesive evenly, ensuring good coverage, especially along the edges and towards the nosing. For waterfall treads, ensure adhesive is applied to the entire surface that will contact the existing tread. Immediately after applying adhesive, position the tread onto the existing stair. For added security, pre-drill pilot holes through the new tread into the existing tread below, and then drive screws or finish nails. Ensure fasteners are countersunk slightly below the surface for a clean finish. For waterfall edges, consider using specialized brackets or reinforcing blocks if required by the design or for structural integrity.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Apply Adhesive and Fasteners

Apply a generous bead of high-quality construction adhesive to the back of each new tread. Spread the adhesive evenly, ensuring good coverage, especially along the edges and towards the nosing. For waterfall treads, ensure adhesive is applied to the entire surface that will contact the existing tread. Immediately after applying adhesive, position the tread onto the existing stair. For added security, pre-drill pilot holes through the new tread into the existing tread below, and then drive screws or finish nails. Ensure fasteners are countersunk slightly below the surface for a clean finish. For waterfall edges, consider using specialized brackets or reinforcing blocks if required by the design or for structural integrity.

Videos for this step

Install First Tread and RiserInstall Remaining Treads and RisersInstall New Treads

Tools and Materials

← Project

How to Cover Waterfall-Style Stairs with Treads

Step 6 of 9·6.8 hr left

Inspect Existing Treads and Risers
30 minutes3 items
Measure and Template for New Treads
45 minutes4 items
Cut New Treads
90 minutes4 items
Prepare Existing Surfaces
60 minutes5 items
Dry Fit New Treads
30 minutes1 items
6
Apply Adhesive and Fasteners
120 minutes8 items
7
Install Waterfall Risers/Returns (if applicable)
60 minutes7 items
8
Fill and Sand Fastener Holes
45 minutes5 items
9
Apply Finish to Treads
180 minutes7 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.