Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 4 · Prepare Existing Surfaces

Clean the existing treads and risers to remove all dust, dirt, grease, and debris. If there are any small holes or imperfections, fill them with wood filler or epoxy and allow them to dry completely. Lightly sand any high spots or uneven areas on the existing surfaces to create a smooth plane. If the existing treads have a slippery finish, lightly scuff-sanding them can provide better adhesion for any adhesive used.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Prepare Existing Surfaces

Clean the existing treads and risers to remove all dust, dirt, grease, and debris. If there are any small holes or imperfections, fill them with wood filler or epoxy and allow them to dry completely. Lightly sand any high spots or uneven areas on the existing surfaces to create a smooth plane. If the existing treads have a slippery finish, lightly scuff-sanding them can provide better adhesion for any adhesive used.

Videos for this step

Prepare Existing Stairs for InstallationPrepare Surface by Filling HolesSand & Prepare Stair Surfaces

Tools and Materials

← Project

How to Cover Waterfall-Style Stairs with Treads

Step 4 of 9·8.3 hr left

Inspect Existing Treads and Risers
30 minutes3 items
Measure and Template for New Treads
45 minutes4 items
Cut New Treads
90 minutes4 items
4
Prepare Existing Surfaces
60 minutes5 items
5
Dry Fit New Treads
30 minutes1 items
6
Apply Adhesive and Fasteners
120 minutes8 items
7
Install Waterfall Risers/Returns (if applicable)
60 minutes7 items
8
Fill and Sand Fastener Holes
45 minutes5 items
9
Apply Finish to Treads
180 minutes7 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.