Step 8 · Install Handrails and Balusters

Install handrail posts securely to the stair stringers or landing framing. Attach the handrail to these posts, ensuring it is at the correct height (typically 34-38 inches above the tread nosing) and extends at least 12 inches beyond the top and bottom steps. Spacing for balusters should not allow a 4-inch sphere to pass through (check local code). Attach balusters to the treads or stringers and to the underside of the handrail using appropriate fasteners and brackets. Ensure all connections are very secure.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 8 · Install Handrails and Balusters

Install handrail posts securely to the stair stringers or landing framing. Attach the handrail to these posts, ensuring it is at the correct height (typically 34-38 inches above the tread nosing) and extends at least 12 inches beyond the top and bottom steps. Spacing for balusters should not allow a 4-inch sphere to pass through (check local code). Attach balusters to the treads or stringers and to the underside of the handrail using appropriate fasteners and brackets. Ensure all connections are very secure.

Videos for this step

Install HandrailsInstall Balusters and HandrailInstall Balusters

Tools and Materials

← Project

How to Build Basement Stairs

Step 8 of 9·7 hr left

Measure and Plan Stair Location
90 minutes6 items
Cut Stair Stringers
120 minutes6 items
Install Top Support for Stringers
60 minutes5 items
Attach Stringers to Top Support
45 minutes4 items
Secure Bottom of Stringers
60 minutes5 items
Cut and Install Treads
180 minutes7 items
Cut and Install Risers (Optional but Recommended)
120 minutes6 items
8
Install Handrails and Balusters
180 minutes7 items
9
Sand and Finish Treads and Risers
240 minutes6 items