Step 3 · Install Top Support for Stringers

At the top of the stair opening, where the stringers will meet the upper level, install a strong support. This can be a pressure-treated ledger board bolted to the subfloor and rim joist, or solid wood blocking installed between the joists. Ensure this support is exceptionally strong as it will bear a significant portion of the stair's load. The ledger board should be level and flush with the edge of the opening where the stringers will sit.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Install Top Support for Stringers

At the top of the stair opening, where the stringers will meet the upper level, install a strong support. This can be a pressure-treated ledger board bolted to the subfloor and rim joist, or solid wood blocking installed between the joists. Ensure this support is exceptionally strong as it will bear a significant portion of the stair's load. The ledger board should be level and flush with the edge of the opening where the stringers will sit.

Videos for this step

Install Ledger Board for StringersDetermine Stringer Attachment to Deck Band BoardAttach Stair Stringer Ledger

Tools and Materials

← Project

How to Build Basement Stairs

Step 3 of 9·14.8 hr left

Measure and Plan Stair Location
90 minutes6 items
Cut Stair Stringers
120 minutes6 items
3
Install Top Support for Stringers
60 minutes5 items
4
Attach Stringers to Top Support
45 minutes4 items
5
Secure Bottom of Stringers
60 minutes5 items
6
Cut and Install Treads
180 minutes7 items
7
Cut and Install Risers (Optional but Recommended)
120 minutes6 items
8
Install Handrails and Balusters
180 minutes7 items
9
Sand and Finish Treads and Risers
240 minutes6 items