Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 6 · Prepare new faucet

Unpack the new faucet and identify all its parts. Refer to the manufacturer's instructions to attach any necessary components, such as the integrated supply lines or deck plate, before installing it onto the sink.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Prepare new faucet

Unpack the new faucet and identify all its parts. Refer to the manufacturer's instructions to attach any necessary components, such as the integrated supply lines or deck plate, before installing it onto the sink.

Videos for this step

Video 1Video 2Video 3

← Project

Kitchen Faucet Replacement

Step 6 of 13·2.5 hr left

Turn off water supply
0 mins
Disconnect water supply lines
0 mins
Remove faucet mounting nuts
0 mins
Remove old faucet
0 mins
Clean sink surface
0 mins
6
Prepare new faucet
0 mins
7
Apply plumber's putty or silicone sealant
0 mins
8
Install new faucet
0 mins
9
Tighten faucet mounting nuts
0 mins
10
Connect new water supply lines
0 mins
11
Turn water supply back on
0 mins
12
Test faucet operation
0 mins
13
Clean up excess sealant
0 mins
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.