Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 4 · Dry Fit the Transition Strip

Before applying any adhesive or fasteners, place the newly cut transition strip into the gap between the two flooring surfaces. Check that it sits level and spans the entire opening without any gaps on either side. Ensure that it meets flush with both flooring materials. If any adjustments are needed, such as minor trimming or sanding of the edges, make them now. This step prevents mistakes after the adhesive is applied or fasteners are driven.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Dry Fit the Transition Strip

Before applying any adhesive or fasteners, place the newly cut transition strip into the gap between the two flooring surfaces. Check that it sits level and spans the entire opening without any gaps on either side. Ensure that it meets flush with both flooring materials. If any adjustments are needed, such as minor trimming or sanding of the edges, make them now. This step prevents mistakes after the adhesive is applied or fasteners are driven.

Videos for this step

Dry Fit ComponentsPosition and Press Transition StripInstall Floor Transition Strip

Tools and Materials

← Project

How to Install a Floor Transition Strip at the Bottom of the Stairs

Step 4 of 7·24.8 hr left

Remove Existing Transition Strip
15 minutes3 items
Clean the Area
20 minutes5 items
Measure and Cut Transition Strip
25 minutes6 items
4
Dry Fit the Transition Strip
10 minutes1 items
5
Install the Transition Strip
30 minutes7 items
6
Clean Up Excess Adhesive
5 minutes2 items
7
Allow Adhesive to Cure
1440 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.